Chalk River reactor prepares for the final repair

Atomic Energy of Canada Limited (AECL) has reported that work continues on qualifying the welders to perform the complex weld techniques on the final repair site of Chalk River, Ontario-based National Research Universal (NRU) reactor.

AECL said that 71 percent of the weld repairs and associated non-destructive examinations have been completed and the repair team will next apply plates and both horizontal and vertical welds to the repair site.

AECL’s return-to-service project director Dave Cox said that the NRU repair team is performing training and reliability testing on the NRU reactor mock-ups in preparation of performing the final repair to the vessel.

It is estimated that NRU will resume isotope production by the end of July. Further guidance on the return-to-service date will be provided when more information becomes available, said AECL.

Subscribe to Radiology Business News

Innovation at work

DataFirst’s Silverback Workflow Engine combines advanced DICOM routing, an integrated HL7 engine, and intelligent workflow orchestration. Newly added Silverback HarmoniX standardizes inconsistent DICOM study and series descriptions to improve hanging protocol consistency, image presentation, and downstream radiology workflows—all within one unified enterprise imaging platform featured at RSNA 2026.

When he happened upon the CIVIE booth at RBMA PaRADigm 2025, Mina Mousa, MD, had no thoughts of leaving his job at 10-physician Radiology Associates of Tallahassee in Florida.  

Sponsored by CIVIE

A small step for technologists. A meaningful step toward patient-centered contrast dosing. And a benefit that can extend to radiologists. 

Sponsored by Bayer

Subscribe to Radiology Business News

Subscribe to Radiology Business News