Netherlands reactor starts to repair primary cooling system

The Nuclear Research and Consultancy Group (NRG) of the Netherlands received approval on May 18 to start the repair of the eroded parts of the High Flux Reactor’s primary cooling system.

At four locations, the pipes are affected by galvanic corrosion. On basis of the inspections and measurement results NRG has decided to execute local repairs of these four locations and the eroded parts will be removed and new aluminum piping material will be welded in.

The repairs to the High Flux Reactor in Petten, Netherlands, are proceeding well and according to plan, the group said. There have been no safety incidents during the project and the radiation dose levels for internal and external employees have remained well below the planned limits, added NRG.

Subscribe to Radiology Business News

Innovation at work

DataFirst’s Silverback Workflow Engine combines advanced DICOM routing, an integrated HL7 engine, and intelligent workflow orchestration. Newly added Silverback HarmoniX standardizes inconsistent DICOM study and series descriptions to improve hanging protocol consistency, image presentation, and downstream radiology workflows—all within one unified enterprise imaging platform featured at RSNA 2026.

When he happened upon the CIVIE booth at RBMA PaRADigm 2025, Mina Mousa, MD, had no thoughts of leaving his job at 10-physician Radiology Associates of Tallahassee in Florida.  

Sponsored by CIVIE

A small step for technologists. A meaningful step toward patient-centered contrast dosing. And a benefit that can extend to radiologists. 

Sponsored by Bayer

Subscribe to Radiology Business News

Subscribe to Radiology Business News