Chalk River repairs 98% done, production to begin in July

Atomic Energy of Canada Limited (AECL) has reported that Chalk River Laboratories, an Ontario-based National Research Universal (NRU) reactor’s weld repairs are 98 percent complete, and work continues to address a single imperfection identified during the final weld repair.

The organization said that site cleaning, grinding and re-welding are now underway, and upon completion of the repair work, a non-destructive exam will be conducted on the site to confirm acceptance of the final repair.

Activities related to the start-up phase of the NRU return-to-service project are ongoing in parallel to repair activities. AECL estimates that NRU will resume isotope production by the end of July.

Subscribe to Radiology Business News

Innovation at work

DataFirst’s Silverback Workflow Engine combines advanced DICOM routing, an integrated HL7 engine, and intelligent workflow orchestration. Newly added Silverback HarmoniX standardizes inconsistent DICOM study and series descriptions to improve hanging protocol consistency, image presentation, and downstream radiology workflows—all within one unified enterprise imaging platform featured at RSNA 2026.

When he happened upon the CIVIE booth at RBMA PaRADigm 2025, Mina Mousa, MD, had no thoughts of leaving his job at 10-physician Radiology Associates of Tallahassee in Florida.  

Sponsored by CIVIE

A small step for technologists. A meaningful step toward patient-centered contrast dosing. And a benefit that can extend to radiologists. 

Sponsored by Bayer

Subscribe to Radiology Business News

Subscribe to Radiology Business News